您当前的位置:
首页 >
文章列表页 >
Construction and cost optimization of the latest metropolitan area integrated transmission network
    • Construction and cost optimization of the latest metropolitan area integrated transmission network

    • Study on Optical communication   Issue 2, Pages: 25-28(2006)
    • DOI:10.13756/j.gtxyj.2006.02.008    

      CLC: TN915
    • Published:2006,

    扫 描 看 全 文

  • HUANG Mei-shan. Construction and cost optimization of the latest metropolitan area integrated transmission network. [J]. (2):25-28(2006) DOI: 10.13756/j.gtxyj.2006.02.008.

  •  
  •  
更多指标>

0

Views

74

下载量

2

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Cost analysis of using WDM to expand local network

Related Author

No data

Related Institution

  中山大学超快速激光光谱国家重点实验室!广东广州510275  
  佛山市电信局  
  广东佛山528000  
  广东省邮电规划设计院!广东广州510095  
  佛山市电信局!广东佛山528000  
0