您当前的位置:
首页 >
文章列表页 >
Construction Method and Verification of High Precision Ground Time Synchronization Links for 5G Mobile Base Stations
    • Construction Method and Verification of High Precision Ground Time Synchronization Links for 5G Mobile Base Stations

    • Study on Optical Communications   Issue 1, Pages: 71-78(2021)
    • DOI:10.13756/j.gtxyj.2021.01.015    

      CLC: TN929.5
    • Published:10 February 2021,

      Received:10 August 2020,

    扫 描 看 全 文

  • WU Yu. Construction Method and Verification of High Precision Ground Time Synchronization Links for 5G Mobile Base Stations. [J]. Study on Optical Communications (1):71-78(2021) DOI: 10.13756/j.gtxyj.2021.01.015.

  •  
  •  
更多指标>

0

Views

151

下载量

1

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Research on Quantum Enhanced Secure Time Synchronization Protocol
Research on NBI Information Model of Transport Network
Applications and Research of DTI in Communication Networks
Study on PMN technology and networking operation mode
Evolution strategy for ASON-based electric power communication networks

Related Author

No data

Related Institution

Research Institute of Telecommunications Transmission, China Academy of Information and Communication Technology
China Academy of Information and Communication Technology
China Electric Power Research Institute
China Academy of Telecommunication Research
State Grid Fujian Power Ltd.
0