您当前的位置:
首页 >
文章列表页 >
Optical Switch Delay Guaranteed Scheduling Algorithm based on Iterative Round Robin
更新时间:2024-10-08
    • Optical Switch Delay Guaranteed Scheduling Algorithm based on Iterative Round Robin

    • Study on Optical Communications   Issue 5, Pages: 24001801-24001805(2024)
    • DOI:10.13756/j.gtxyj.2024.05.240018    

      CLC: TN929
    • Published:10 October 2024,

      Received:26 January 2024,

      Revised:11 March 2024,

    移动端阅览

  • Huang H T, Yan F L,Guo S J,et al, Optical Switch Delay Guaranteed Scheduling Algorithm based on Iterative Round Robin[J]. Study on Optical Communications, 2024(5):240018. DOI: 10.13756/j.gtxyj.2024.05.240018.

  •  
  •  

0

Views

0

下载量

0

CSCD

0

CNKI被引量

>
Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Research on a scheduling algorithm for optical switching core nodes
Scheduling algorithm of optical switches with switching delay
The analysis of scheduling problem in time-slot optical burst switching networks
Development of crossbar switches with virtual output queuing and buffered cross points

Related Author

Zhang Tai
Chai Jiwen
LI Ji-bi
MAO Qi-jian
ZHANG Zhi-zhong
OU Liang
TAN Xian-si
YAO Hua-xiong

Related Institution

Electric Power Research Institute,State Grid Sichuan Electric Power Compamy
Communication Engineering Institute,Chongqing University of Posts and Telecommunications
  重庆邮电学院通信工程学院 重庆400065  
Dept.of Electronics and Information Engineering,HUST
  华中科技大学电子与信息工程系 湖北武汉430074  
0